Thermal Management stories
India's growing laptop accessory market gets three cooling pads priced from INR 2,999, aimed at easing heat and posture strain for users.
Hundreds of jobs and local testing capacity are set to follow, as Vertiv expands regional supply for AI data centre equipment across Asia.
Data centre demand and decarbonisation pressures are set to shape Alfa Laval's UK and Ireland growth strategy under Alessandro Bracco.
The rack-ready system targets organisations needing denser, liquid-cooled infrastructure as AI and scientific computing demands surge.
Demand is being lifted by edge and AI workloads, with the market forecast to more than double to USD $4.32 billion by 2030.
Rising AI data centre demand is pushing operators to seek stronger thermal systems, as Vertiv adds ThermoKey's heat-exchange know-how in EMEA.
Liquid cooling is gaining ground as AI data centres outgrow air systems, with the market forecast to hit USD $1.3 billion by 2032.
Standardised blueprints could help operators add AI capacity faster as rising power and cooling demands strain data centre builds worldwide.
The move should cut AI inference costs for Zoho while giving the software group tighter control over data, power use and its infrastructure stack.
Rising data centre power demand is pushing Orbital to test orbit-based AI compute as it prepares a Pathfinder mission for 2027.
Data-centre operators face rising power bills as Trane's HFO shift and liquid-cooling push cut emissions and HVAC costs.
AI server operators could cut heat and power losses as Lotus Microsystems' module targets denser racks and faster load response.
The in-house platform is meant to lower AI inference bills by 20-30% and trim data-centre power use as Zoho tightens control over its stack.
AI operators could bring new capacity online faster, as Delta says its prefabricated system may cut data centre deployment time by 60%.
Searches for ways to cool overheated handsets have surged as experts warn fridge fixes and ice packs can cause moisture damage.
The new site will create up to 500 jobs as the firm expands capacity for AI and high-density data centre gear across Asia-Pacific.
Pressure to add AI capacity is pushing developers towards modular builds that can be launched in 24 weeks rather than years.
Operators of AI data centres can now handle heavier, deeper equipment as Vertiv's new rack supports up to 4,500 lbs without sacrificing mobility.
The deal secures rare long-term UK AI capacity as demand for power-hungry inference computing outstrips available data centre infrastructure.
Lower power use and total cost of ownership are central to Zoho's new server, aimed at cutting AI inference costs and tightening data control.